Bitcoin Mining & Production Cost
Estimated cost to produce one bitcoin today, calculated live from network hashrate, miner efficiency and electricity price.
Assumptions: 19 J/TH average efficiency, $0.05 per kWh, electricity = 70% of total cost. Data: mempool.space and Coin Metrics, as of Nov 21, 2026.
Mining cost calculator
Per machine, per day
Bitcoin price vs production cost
Costs are calculated with today's assumptions (19 J/TH, 0.05 USD/kWh) for the whole period; in earlier years the average machine was less efficient, so real costs were somewhat higher. Hashprice needs no assumptions: miner revenue per PH/s per day.
Cost to mine 1 BTC by electricity price and miner
| Electricity | Antminer S21 XP13.5 J/TH | Antminer S2117.5 J/TH | Network average19 J/TH | Antminer S19 XP21.5 J/TH | Antminer S19j Pro29.5 J/TH |
|---|---|---|---|---|---|
| $0.03 | $22,349 | $28,971 | $31,454 | $35,593 | $48,836 |
| $0.04 | $29,798 | $38,628 | $41,939 | $47,457 | $65,115 |
| $0.05 | $37,248 | $48,285 | $52,423 | $59,321 | $81,394 |
| $0.06 | $44,698 | $57,941 | $62,908 | $71,185 | $97,673 |
| $0.07 | $52,147 | $67,598 | $73,392 | $83,049 | $113,952 |
| $0.08 | $59,597 | $77,255 | $83,877 | $94,914 | $130,230 |
| $0.10 | $74,496 | $96,569 | $104,846 | $118,642 | $162,788 |
Electricity cost only, at today's hashrate. Red: above the current bitcoin price; green: below it.
Halving effect on the production cost
At block 1,050,000 the block reward falls from 3.125 to 1.5625 BTC. At today's hashrate and electricity price, the electricity cost of one bitcoin would rise to about $104,140, unless the price rises or less efficient miners switch off. Bitcoin halving →
What does it cost to produce one bitcoin?
New bitcoins are created by miners. Roughly every ten minutes one miner finds a block and receives the block reward (currently 3.125 BTC) plus the transaction fees inside it, about 450 BTC per day for the whole network. To win those blocks, miners run specialised computers (ASICs) around the clock, and their biggest expense is electricity.
How we calculate the production cost
Electricity cost per BTC = network hashrate × average machine efficiency (joules per terahash) × 24 hours × electricity price ÷ bitcoins mined per day. The all-in cost also covers hardware, hosting, staff and financing: we divide the electricity cost by electricity's share of total costs (70% by default). Every assumption can be changed in the calculator.
Why the production cost matters
When the price falls close to or below the cost of production, less efficient miners switch off, hashrate growth slows and miners may sell more of their coins to cover costs. In past cycles the price rarely stayed below the estimated production cost for long, which is why many analysts treat it as a soft floor. It is a useful reference, not a guarantee.
Limits of the estimate
Real costs differ from miner to miner: electricity contracts range from under 3 to over 10 cents per kWh, and the fleet mixes new and old machines. The figures here are a model estimate for the network as a whole and are not investment advice.